Expanding a -48V telecom power system is not as simple as adding more rectifier modules. When a base station adds radio units, transmission equipment or other loads, the existing system needs to be reassessed.
The expansion review should cover the additional load, AC input capacity, DC busbars and branch circuits, cooling, batteries and monitoring parameters. If any of these parts cannot support the increased demand, it may limit the expansion.
The system should also be checked again after expansion to verify its performance under key operating conditions.
When a base station adds radio frequency units, transmission equipment or other loads, the first step is to determine the actual power demand of the additional equipment.
Simply adding up equipment nameplate ratings is not enough. The assessment should also consider actual operating power, peak power demand, the possibility of further expansion and whether rectifier modules may need to be derated at high temperatures.
A system that operates continuously at a 95% load rate may still be within its rated capacity, but it has very little room for further expansion.
Expansion planning should therefore be based on actual load requirements rather than rated capacity alone.
Adding rectifier modules also increases the AC input current.
If the upstream circuit breaker, AC cables and distribution capacity remain unchanged, they may become bottlenecks in the expanded system.
This is particularly important at remote sites where the available AC supply may already have limited capacity. Adding rectifier modules does not mean that the upstream power supply can automatically provide the additional power.
Before expansion, check whether the existing AC input configuration can support the increased demand.
At larger base stations or equipment rooms with multiple rectifier systems, adding new equipment may cause one AC phase to carry a heavier load over an extended period.
The three-phase currents should be checked during expansion. If necessary, the AC branches of the modules or cabinets can be redistributed to avoid one phase reaching its capacity limit first.
The rectifier modules supply power to the 48V DC bus. The busbars, fuses, main switches and battery connection cables must therefore be able to carry the increased current.
If only the number of rectifier modules is increased without checking these shared components, the system may experience abnormal heating or voltage drop.
Expansion should include a review of the DC busbars and branch circuits to confirm that they can support the increased current.
As the number of rectifier modules increases, the total system power loss also rises. The airflow arrangement and air-conditioning load will increase accordingly.
A cooling system that was just sufficient for the original configuration may no longer be adequate after expansion.
During summer, the system may experience higher inlet temperatures, fans running at full speed or rectifier module derating.
Cooling should therefore be checked as a separate item during expansion assessment.
When the base station load increases, the backup time provided by the existing batteries becomes shorter during a power outage.
If the customer still requires the same backup duration, battery capacity needs to be reassessed and may need to be increased. The load-shedding strategy may also need to be optimized.
New batteries should not be connected in parallel with older battery groups without proper assessment.
Differences in internal resistance and state of charge (SOC) may result in uneven current sharing between the parallel battery groups.
Before battery expansion, check the health of the existing batteries, the parallel connection arrangement, BMS compatibility and protection configuration. If necessary, manage the battery groups separately.
Even if the rectifier capacity is sufficient after expansion, the battery backup time will decrease as the discharge power increases.
If a project requires the base station to continue operating for two hours after a power outage, the battery capacity must be checked again, taking temperature and battery aging margins into account.
Expansion planning should not focus only on whether the system can support the load when AC power is available. Backup duration during a power outage must also be reassessed.
The average load shown by the monitoring platform may be only 50%, but the instantaneous load can be significantly higher during peak business periods, equipment startup or high-temperature derating.
Expansion assessment should review operating data over a period of time, including:
Using actual operating data provides a more reliable basis for expansion than relying on a single on-site reading or average load figure.
An expansion plan should provide a clear comparison of the system before and after the modification.
Before implementation, record the existing load, number of rectifier modules, redundancy, battery backup time and high-temperature margin.
After expansion, provide the same set of information again. This allows the customer to see what the additional capacity has achieved and whether any new limitations remain.
For example, if adding rectifier modules restores N+1 redundancy but the battery backup time is still reduced, the battery system may also need to be expanded.
A before-and-after comparison explains the result of the expansion more clearly than a list of newly added equipment.
After adding modules and loads, the expanded system should be tested again under key operating conditions.
The tests should include:
The fact that the original system passed these tests does not mean the expanded system will still meet the same requirements.
Expansion is effectively a small-scale system modification, so the relevant operating conditions need to be checked again.
Adding rectifier modules and branch circuits changes the actual system configuration. The related documentation should be updated accordingly.
This includes:
If the physical system has changed but the drawings still reflect the previous configuration, future maintenance may be affected by outdated information.
Documentation updates should therefore be included in the expansion acceptance process.
The new maximum load, redundancy and backup time should also be recorded in the site file to support future expansion planning.
Expanding a 48V telecom power system requires more than adding rectifier modules. The AC input supply, DC busbars, branch circuits, cooling system and batteries all need to be checked against the increased load.
A reliable expansion plan should be based on actual operating data, include a reassessment of battery backup time and verify the system under key operating conditions after the modification.
Modular power systems make expansion more convenient, but that does not mean modules can be added without checking the rest of the system. A successful expansion depends on whether the entire power system can support the increased demand.
EverExceed is a global manufacturer of customized AC/DC power solutions, specializing in industrial batteries, telecom power systems, industrial battery chargers and UPS solutions. With in-house R&D and manufacturing capabilities, EverExceed provides reliable power solutions for diverse industrial and telecom applications.